Soft K Consulting
Soft K LLP was founded in 2015 and is a software company operating inside Aksai Industrial Park that offers IT consulting services, ERP management system production and assistance, technical and organizational consulting. It is specialized in system integration and implementation of innovative systems based on the most modern technologies.
Soft K LLP provides support solutions and offers a bespoke system management development resulting in a cost saving optimization in operations for its clients.
Among the services provided through the years to KPO are material reconciliation analysis of warehouse activities, Min-Max level analysis, bill of material analysis, orphan material analysis focused on spare parts usage, review of warehouse stock without certification, excessive stock and no move/slow move analysis.
Technicians and preservation engineers were deployed to the KPO warehouses in order to both analyze and review existing material preservation procedures and actually execute them on P&M materials.
Among the services provided through the years to KPO are material reconciliation analysis of warehouse activities, Min-Max level analysis, bill of material analysis, orphan material analysis focused on spare parts usage, review of warehouse stock without certification, excessive stock and no move/slow move analysis.
Technicians and preservation engineers were deployed to the KPO warehouses in order to both analyze and review existing material preservation procedures and actually execute them on P&M materials.
Material Controllers were embedded within the Shutdown Group in order to analyze material requirements for the shutdowns. All critical materials were then managed through the procurement, issue and return process before, during and after major maintenance shutdowns.
With its personnel Soft K LLP is able to perform field inspections for KPO of critical equipment in order to ensure that the information on the SAP system is actually still correct. Specific tools can be developed for the Spare Parts team to facilitate analysis to perform a complete spare parts analysis once the equipment of the field is inspected.
All Unit 3 Valves were inspected and dimensional and manufacturer data and specifications were collected for an emergency fit for use analysis over the course of about 6 months.
With its personnel Soft K LLP is able to perform field inspections for KPO of critical equipment in order to ensure that the information on the SAP system is actually still correct. Specific tools can be developed for the Spare Parts team to facilitate analysis to perform a complete spare parts analysis once the equipment of the field is inspected.
All Unit 3 Valves were inspected and dimensional and manufacturer data and specifications were collected for an emergency fit for use analysis over the course of about 6 months.